The right generator depends on its intended use, operating hours and electrical load.
Consider these four factors for your installation site and operating needs.
Identify the equipment to be powered, the total load and motor starting loads.
Decide whether the generator will run during outages or more regularly.
Assess ventilation, exhaust, noise and access for maintenance.
Plan the transfer panel, connections and testing under load.